Design, consulting / reviewing owner’s requirements / design V.E. / finalizing the initial design with LCC and environment-friendly techniques
Determining the project construction costs, schedule, and quality
Optimal design and consultation work based on experience with LOTTE World Tower and exclusive knowledge
Proactive Response → Eliminates the trial-and-error due to a lack of consulting
The only CM company in Korea capable of construction-related service
Establishing optimal plans with the analysis of
LOTTE Group’s LCC and environmental case studies
Establishing optimal plans with the analysis of LOTTE Group’s LCC and environmental case studies
Multiregional water supply heating and cooling, photovoltaic generation, geothermal heating, insulation technologies, icing and water heat storage, optimizing the lighting density, etc.
Energy (51,166 MWh × KRW 189,000) + CO2 (23,115 T × KRW 26,000)
기Existing Design KRW 11.6 trillion(LCC over 100 years), LCC improvements KRW 10.6 trillion(LCC over 100 years)
Environmental proposals backed by data from actual operations
Reducing the construction cost with data from nearly 800 cases of project V.E. and enterprise-wide support
-KRW 90.1
billion
-KRW 32
billion
-KRW 27.9
billion
-KRW 18.7
billion
-KRW 12.4
billion
Reflecting all owner’s requirements completely during the early stage of design to prevent design changes
Investment Costs, Schedule, Feasibility, Quality, Trend
Quick application, Fast feedback
Application of BIM services to the early design stage and facilitating quick and accurate decision-making
LOTTE Group’s BIM experience 01
LOTTE Academy
LOTTE Group’s BIM experience 02
Uiwang LOTTE Shopping Mall, etc.